The Zhejiang Company has successfully completed the foundation acceptance inspection for the Heavy Steel Workshop.

Release Date:

2013-11-18 12:49

On the morning of November 4, the acceptance inspection of the foundation for the 20,000-ton-per-year heavy steel workshop at Zhejiang Company was conducted smoothly. Under the chairmanship of the company’s project department, representatives from six parties—namely, the design institute, the geological exploration institute, the engineering supervision company, the quality supervision station, the contractor, and the owner—participated in the inspection.
The six participating parties first conducted a thorough on-site inspection and field measurements at the Chongqing Steel Workshop construction site, carefully evaluating the site conditions, the contractor’s performance, and the construction materials. They then proceeded to the conference room to review documentation, compare drawings, and engage in on-site discussions. Following a comprehensive analysis and assessment, all attendees unanimously concluded that the foundation acceptance was satisfactory and approved the project.

Related News