A key production base for powertrains and energy systems of Great Wall Motor. With a total floor area of 140,000 square meters, it comprises three major workshops—assembly, formation, and module—as well as an office building. The structure features portal steel frames and steel frame construction.
The total floor area is 61,000 square meters, encompassing a new‑energy vehicle experience center (four stories), serviced apartments (on the 25th, 27th, and 29th floors), and commercial office space (22 stories), as well as underground parking and utility facilities.
Phase I steel structure project of Jingding Precision Technology Co., Ltd.’s Thai plant: Located in the Smart City Industrial Park, Amata City, Chonburi Province, Thailand, the project comprises four separate buildings—A, B, C, and D—consisting of two workshops, an office building, and an energy center, with a total floor area of 48,872.18 square meters and a steel consumption of 13,250 tons.
Zhejiang Tiansheng Chemical Fiber Co., Ltd.’s 500,000‑ton‑per‑year chemical fiber project: The facility is located in Shaoxing Binhai, with a total investment of RMB 2 billion. It comprises two sets of boiler‑fired production units, each capable of producing 500,000 tons of differentiated chemical fibers annually.
Copyright © Yuegong Holding Group Co., Ltd.Website Development: China Enterprise Dynamics Shaoxing