The project is located in Jinan City, Shandong Province. The total floor area of the building is 44,803 square meters, with an eave height of 16.5 meters and a maximum crane lifting capacity of 260 tons.

The project is a six-track inspection depot for the Jinan East EMU Depot on the Jinan–Qingdao High-Speed Railway. Located at the Jinan–Qingdao HSR hub, the depot’s main structure consists of reinforced concrete columns and steel trusses. It measures 468 meters in length, 62.65 meters in width, and has a building height of 13.84 meters, with a total floor area of 33,690 square meters. The steel roof trusses have a span of 49 meters, a height of 5.35 meters, and column center-to-center spacing of 6 meters; the heaviest single truss weighs 17.5 tons.

The project has a total floor area of 48,015 square meters, with some sections extending over two stories. The factory layout is U-shaped, featuring a maximum span of 30 meters.

The project employs a cable-stayed arch truss structural system, with a length of 280 meters, a single span of 120 meters, and a roof elevation of 42 meters.

< 1...212223...29 >