+
  • 微信图片_20250527092319.jpg

Dongyang Hengdian General Airport Construction Project

The structure is a combination of a frame system and steel construction, with a building height of approximately 18 meters and one above-ground floor. The steel space frame has a maximum span of 82 meters, and the total floor area is about 3,906 square meters. The curtain wall covers an area of approximately 5,047 square meters.

Category:

General Contracting Project


Contact Us